Mon-Fri 8am-4pm✅ Free quotation within 48 hours📍 Sevenoaks & Croydon
🧯 Steelwork Guide

Fire protection for structural steelwork

Steel does not burn, but it loses strength as it heats up. Fire protection keeps it cool enough, for long enough, for people to escape and firefighters to work.

Why steel needs protection

Structural steel loses about half its strength at around 550°C. In a fire, unprotected steel can reach this in minutes, so many buildings need the steel frame protected for a set time.

Fire resistance periods

The required period - typically 30, 60, 90 or 120 minutes - comes from Approved Document B (Fire Safety) and the building's fire strategy. It depends on the use and height of the building. In houses, steel beams are often protected by the plasterboard ceiling or boxing-in rather than a coating.

The main methods

  • Intumescent coatings - thin paint films that swell into an insulating char when heated. Neat, and keep the steel shape visible. Applied in a factory or on site
  • Boards - fire-rated boards fixed around the steel, often used where the steel is hidden
  • Sprayed coatings - cement or mineral based sprays for hidden steel in larger buildings
  • Concrete encasement - less common today

Section factor

Thin, light sections heat up faster than heavy ones. The section factor (the heated perimeter divided by the cross-section area, often written Hp/A) tells the specialist how thick the protection must be. Lighter sections and 4-sided exposure need thicker coatings.

How it is specified

The fire engineer or designer sets the period and the members to protect. A specialist then calculates the thickness for each section using a tested product. Intumescent coatings must be compatible with the primer and any topcoat, and are best applied by a third-party certificated contractor.

How we handle it

We arrange intumescent coatings through specialist applicators and coordinate them with our fabrication programme, so the steel arrives protected and ready to fit. Use our coating area calculator to estimate the area to be protected.

General guidance only. Fire protection must be specified by a competent designer for your building.

Questions

Frequently asked questions

Usually they need protection such as a plasterboard ceiling or boxing-in. Building control will confirm what your project needs.

A coating that swells into an insulating char in a fire, slowing the rise in steel temperature for a rated period.

We arrange them through specialist applicators and coordinate them with our fabrication programme.

Ready to price your steel?

Send your drawings or describe the job. You'll have a competitive, no-obligation quotation within 48 hours.

📞
Free quote in 48h